Keel Laying for Royal Princess Marks Construction Milestone
Published Thursday, October 20th 2011![]() The first 500-ton piece of Royal Princess is lowered into the building dock during today's keel laying ceremony in Italy. |
Following a traditional blessing by a priest, the ship’s keel – which weighs approximately 500 tons – was moved into position by a huge crane onto the keel blocks. The computer-guided maneuver took only minutes, belying the more than two million man hours that will ultimately go into building the vessel. The 3,600-passenger, 141,000-ton ship will remain in the building dock until its float-out next summer. |
Leave a Reply
indicates a required field